Wildlife Eco-Passage Tunnel and Culvert Comments


The project consists of the replacement of existing twin barrel corrugated steel pipe (CSP) storm culvert with a concrete box culvert which encompasses a wildlife tunnel for the safe passage of local turtle species crossing the roadway. This project also includes installation of wildlife fencing, nesting areas on the south boulevard along Salamander Pond, new guard rails on the north boulevard, and stone retaining walls to address slope stability issues and reinforce the structural integrity of the culvert and channel.